Annual Joint Seal, Crack & Spall Repair, Annual Rubber Removal and Restriping, & Hangar 6 Pads

Project Location:

Annual Joint Seal, Crack & Spall Repair, Annual Rubber Removal and Restriping, & Hangar 6 Pads

output-onlinepngtools.png
output-onlinepngtools.png
output-onlinepngtools.png
output-onlinepngtools.png

Project Location:

Pope and Simmons Army Airfield, NC

Project Size:

$3.2 Million

Project Manager:

Jay Warren

Work for this project includes:

This project is a design/build project, which ADC Engineering will be our design partner. The project consists of miscellaneous pavement repairs including crack and spall repair, slab replacement, joint reseal, rubber removal, pavement markings, and also the full-depth replacement of the North and South pads at Hangar 6 on Pope AAF.