top of page
Annual Joint Seal, Crack & Spall Repair, Annual Rubber Removal and Restriping, & Hangar 6 Pads
Project Location:
Annual Joint Seal, Crack & Spall Repair, Annual Rubber Removal and Restriping, & Hangar 6 Pads
Project Location:
Pope and Simmons Army Airfield, NC
Project Size:
$3.2 Million
Project Manager:
Jay Warren
Work for this project includes:
This project is a design/build project, which ADC Engineering will be our design partner. The project consists of miscellaneous pavement repairs including crack and spall repair, slab replacement, joint reseal, rubber removal, pavement markings, and also the full-depth replacement of the North and South pads at Hangar 6 on Pope AAF.
bottom of page