top of page

Pope Army Airfield Runway Replacement

Project Location:

Pope Army Airfield Runway Replacement

output-onlinepngtools.png
output-onlinepngtools.png
output-onlinepngtools.png
output-onlinepngtools.png

Project Location:

Pope AAF, Ft. Bragg, North Carolina

Project Size:

$81.4 Million

Project Manager:

Luke Beach and Jay Warren

Prime Contractor:

R.C. Construction Co., Inc. and Millstone-Weber, a Joint Venture

Work for this project includes:

Removal and replacement of existing electrical equipment, including airfield lighting and airfield vault equipment and reconstruction of runway 05-23.

bottom of page