top of page

Reception Station Barracks

Project Location:

Reception Station Barracks

output-onlinepngtools.png
output-onlinepngtools.png
output-onlinepngtools.png
output-onlinepngtools.png

Project Location:

Fort Benning Georgia

Project Size:

$15 Million

Project Manager:

Zeb O'Bryant

Work for this project includes:

Provide all labor, materials, equipment, and supervision to complete the design and renovation construction of failed and failing components of the existing Bldg. 3035, Reception Station Barracks. The building systems scheduled for repair include roof, some exterior walls, windows, fire protection, interior walls, doors, insulation, interior finish, finish floors, new fire access lane ceilings, plumbing, HVAC, HVAC controls, electrical, mechanical and building information systems. Any mold present will be removed from the building. Existing concrete within the building footprint will be repaired/replaced and refinished to make look like new. New infill brick will match existing as closely as possible. Work will also include necessary site grading, storm, drainage, concrete troop walks and stabilization.

bottom of page