top of page
STOVL Simulated Carrier Landing Deck
Project Location:
STOVL Simulated Carrier Landing Deck
Project Location:
Fort Benning, Georgia
Project Size:
$23 Million
Project Manager:
Work for this project includes:
The project scope consisted of asphalt and concrete pavements, airfield lighting, and an auxiliary airfield control tower. The Simulated Landing Helicopter Assault (LHA) Ship Deck and Two Vertical Landing (VL) pads were constructed with continuously reinforced high temperature concrete pavement sections. The high temperature concrete was specially designed to resist extreme conditions generated by the Marine Corps new F35 Lightning Aircraft during vertical landings.