TUAV Maintenance Facility
Project Location:
TUAV Maintenance Facility
Project Location:
Fort Benning, Georgia
Project Size:
$4.6 Million
Project Manager:
Derrick Bell
Work for this project includes:
Approximately 11,590 SF to include maintenance bays, meeting room/classroom, latrines with showers, administrative areas, break room, storage room, and private and open offices. Building systems include HVAC, plumbing, fire alarm, mass notification, fire suppression, energy management and building controls, telephone cabling, unclassified and classified communications networks, CATV network, intrusion detection building infrastructure, and electronic access control systems. Supporting facilities include site preparation, utilities (electrical, water, sanitary sewer, natural gas, and information systems), site lighting, vehicle parking, access drives, pavements, curb and gutter, sidewalks, storm drainage, landscaping, localized site demolition, and other site improvements.